The best ready-made prefabricated houses in Nigeria

Did you know that Karmod with its 30 years experience in the sector, 20.000 m ² production facility, earthquake resistant galvanized steel profiles and more than 10.000 customer reference letters is the most demanded brand for prefabricated buildings?

TECHNICAL FEATURES OF PREFABRICATED HOMES
TECHNICAL DATA
EARTHQUAKE CONDITIONS(1st degree earthquake zone) effective ground acceleration coefficient: A0=0,4
CLIMATE CONDITIONSProduction is made based on 3rd climate zone
SNOW LOAD VALUE75 Kg/m2 (Montaj yerine göre değişmektedir)
WIND SPEED VALUE80 km/h (Must be fixed to the ground)
EXTERIOR WALL INSULATION COEFFICIENTK: 0.45 Kcal/m²hC ( K: 0,53 W/m² K )
INTERNAL WALL INSULATION COEFFICIENTK: 0.44 Kcal/m²hC ( K: 0,51 W/m² K )
LIGHT STEEL MATERIALErdemir 1311 ,(ST-37 ) Standard DIN EN 10147-00, zinc plated galvanized steel structure is used.
CEMENT BOARDDensity: ~ 1300 kg / m³ flame retardant (B1 to DIN 4102 Part 1)Thermal conductivity coefficient (λ10 ˚ C dry)
EPS (Expanded Polystyrene Foam)TS EN 13163
CHASSIS LOAD CAPACITY200 kg/m² (for two-storey buildings) (Calculated according toT.S 498 e.)
ROOF INSULATION COEFFICIENTK: 0.39 Kcal/m²hC ( K: 0,43 W/m² K )
INTERIOR AND EXTERIOR PANELS
The outer and inner panels are manufactured of 8X1250X2500 mm two-sided cement board. 84mm 12 density polystyrene rigid foam in used between cement baords for insulation. Outer panel thickness is 10 cm and inner panels are 6 cm an the panel height is 250 cm. The heaviest wall panel among the full panel, window panel, door panel, transom panel from which prefabricated houses are made (125x250 cm exterior door panel) is 114 kg.
PANEL JOINTS
As joining elements special U and H galvanized steel profiles are used that are bent and combined by means of special connection system. Rust will not occur as a result of sweating because of the curved edges.
CARRIER CONSTRUCTIONS
Roof trusses, beams and columns are made of special shaped galvanized steel profiles. Along the building every 1250 mm a special shaped steel truss is placed and on top of truss a special shaped galvanized steel purlin is mounted. Bolts and nuts are used in assembly so that building can be reassembled many times. Production is being done in our modern production facilities with seamless and bold connection system.
MEZZANINE CONSTRUCTION
The mezzanine construction carrier frame is made of special shaped galvanized steel profiles. The mezzanine floor is covered with 16mm cement board (cement-bonded particle board). On the ground floor suspended ceiling an 80 mm thickness (14 kg/m³) layer of glass wool is placed for sound and heat insulation. The mezzanine load is 200 kg/m²
ROOF
ROOF SYSTEMSloping value for gable roof and pitched roof systems is 30%
ROOF COVERING AND INSULATIONOver the metal purlin, painted trapezoidal steel sheets are placed as roof covering.Optionanally tile pattern painted trapezoidal sheets can be applied. Gable end covering is PVC paneling. Overhangs are 20 cm.Wide galvanized steel sheet shaped fringes with vents are used. For the roof special shaped galvanized steel sheet in diagonal shape are being used. PVC made square shape rain gutters and cylindrical downspouts with mounted accessories are used. Rain gutters and its accessories can be made of steel sheet upon request.
CEILING
For ceiling covering 12 mm gypsum boards are used. For ceiling insulation above the suspended ceiling gypsum board, 80 mm glass wool is laid. Below the combining roof chassis, omega profiles that are made of galvanized steel are fastened. Rust will not occur as reasult of sweating that occurs on steel sheet edges because of curved shape. PVC cover is used on ceiling Omega profiles to give them aesthetical look. Gypsum boards joining elements are made of electrostatic painted aluminium material. For wet places cement board is used as ceiling covering.
DOOR
EXT.DOOR90x200 cm Steel door with metal frame. For external doors a special cylindrical, first class, TSE certified locks are used.
INT.DOORInterior doors: 80x200 sizes, galvanized steel frame, off-white wooden American door. Aluminum and PVC doors are also optional. TSE certified built-in locks are in use.
WINDOWS
WINDOW120X100, 120x160 cm and 60x40 cm (transom window) of PVC-based materials and TSE certified and also 60 series. (Optionally frames made out of cement board can be applied around windows and transoms).
DOUBLE GLAZINGAll glass used for windows is 4 + 16 + 4 double glazed, and for transom frosted glass is used.
When order is placed all doors and windows dimensions must be mentioned.
STAIRS
Produced from galvanized steel profiles ,that are specially shaped by rollform machines. Stairs are assembled using seamless screw system. Steps are covered with wood and risers are open. Handrails are manufactured from decorative wrought iron. Metal parts are painted with electrostatic paint.Optionally the stairs can be produced completely from wood.
PAINTINGS
EXTERIOR PAINTINGExternal metal parts are painted double layer coating and with double layer synthetic oil paint. External cement boards panels surfaces are painted with acrylic paint. For external wall mastic is applied on the jointing areas. TSE certified painting products are used in our buildings.
INTERIOR PAINTINGThe interior cement board surfaces and ceiling gypsum boards are painted with plastic paint. TSE certified painting products are used in our buildings.
OTHERThe galvanized cold formed trusses, purlin and panel frames are not coated as they are produced by means of seamless technology.
ELECTRICAL INSTALATION
INSTALLATIONSElectric installation is applied over plaster using TSE certified cables.
CABLESInstallation is applied over plaster and can be flush mounted optionally.
FUSESTSE certified fuses are used.
LIGHTING FIXTURESTSE certified materials are used.
SWITCH & SOCKETTSE certified switch and sockets are used.
OUTER CONNECTIONElectric meter, ground rods and outdoor connections are responsability of the buyer.
SANITARY INSTALLATION
INSTALLATIONInstallation is applied over plaster and can be flush mounted optionally.
SANITARY WARETSE certified materials are used.
TAP AND SHOWER EQUIPMENTTSE certified materials are used.
PIPESClean water pipes are made of PPRC and waste water pipes are made of PVC and all materials are TSE certified.
OUTER CONNECTIONWater meter and outer connections are responsability of the buyer.
FOUNDATION AND CONCRETE
Concrete slab (foundation) should be done according to the concrete plan (basic dimensions) provided by Karmod. Concrete slab and soil survey are responsabilites of the customer.The building is fixed to the ground with anchors and steel dowels. Anchored raft or steel wire mesh foundation should be prepared. The customer is responsible for all excavation operations.
Karmod Prefabricated Building Technologies has right to make modifications on Technical Specification.
en_USEnglish
× How can we help you?